• Mont_Royal_New_Build_Bathroom_Renovation2
  • Mont_Royal_New_Build_Kitchen_Renovation1
  • Mont_Royal_New_Build_Bathroom_Renovation1
  • Mont_Royal_New_Build_Kitchen_Renovation2
  • Mont_Royal_New_Home_Build
  • Prospect_Bathroom_Renovation
  • Prospect_Bedroom
  • Prospect_Drive_Home_Renovation
  • Prospect_Fireplace_Mantel_detail
  • Prospect_Fireplace
  • Prospect_Front_Door
  • Prospect_Master_Bedroom
  • Prospect_Stairway_Renovation

PROJECT HIGHLIGHTS

  • Complete renovation of Lewis Post and beam house
  • Every exterior wall rebuilt to replace shoddy framing and to comply with thermal insulation code requirements
  • Radiant floor heating throughout with high efficiency boiler
  • 1700 gallon water collection system
  • Chimney removed and replaced with insulated firebox
  • Two direct vent fireplaces with fans
  • Single carport expanded to heated, enclosed, two-car garage with workshop, vestibule and large mechanical / storage room
  • Flooring throughout is 100% reclaimed one hundred year old fir from local school renovation
  • New electrical, plumbing, and mechanical throughout
  • Jet tub and oversized shower with skylight in master ensuite
  • Complete landscaping

Project Details